Permit Fees
Below is a table of the most common Permit Costs by Permit Type.
Permit Type |
Permit Cost |
Above Ground Pool |
$89.60 |
Above Ground Gas Tank |
$110.30 |
Back Flow Preventer |
$89.60 |
Door Replacement |
$109.60 |
HVAC Change Out |
$89.60 |
Electric Service Change Out / Temp Power |
$89.60 |
Garage Door Replacement |
$89.60 |
House Re-Pipe |
$89.60 |
Irrigation |
$89.60 |
Fence |
$170.00 |
Shed |
starts at $85.00 |
Pool Heater |
$109.60 |
Roof |
$109.60 |
Screen Enclosure on an Existing Deck |
$109.60 |
Shutters (Hurricane) |
$89.60 |
Shutters with Electric (Hurricane) |
$89.60 |
Underground Gas Tank |
$110.30 |
Water Connect |
$89.60 |
Water Heater |
$89.60 |
- A $40 fee will be added to any permit requiring an Occupation of Easement.
- An Occupation of Easement is required when a fence is being installed in a 20ft or 25ft easement.
- Additional fees may be applied based on application type, plan review, and required inspections.
For the Building Division's complete fee schedule, see Section D.
The International Code Council Building Valuation Data -Square Foot Construction Costs is used to determine the valuation for construction projects within the City of North Port. ICC-BVD-Table.pdf(PDF, 322KB)