Unified Land Development Code

Adoption

On Aug. 6, 2024, City Commission adopted the New Unified Land Development Code, click below for the updated zoning map and adopted ULDC, both are effective October 28, 2024. 

New Zoning Map(PDF, 3MB) Adopted ULDC(PDF, 6MB)

 

North Port Sun Editorial Column(PDF, 87KB)

History

The City of North Port started updating its Unified Land Development Code, or ULDC for short, back in 2015.

The updated Unified Land Development Code contains six chapters and an appendix of definitions. With the ULDC update, the City will adopt a new zoning map. All existing, permitted uses and structures can remain in place even if the new zoning map changes the property’s zoning designation.

Why change?

This update overhauls the ULDC to better reflect our vision for the future, resolve regulatory conflicts within the ULDC, and have a code that adheres to state and federal regulations. The updated Unified Land Development Code also reorganizes how the City presents development regulations. The ULDC is organized into six chapters with the definitions in the appendix. Each regulation in the ULDC is numbered to describe the chapter, article, and section it is located in.

ULDC Education Session

Oct. 4, 2024

 

Archive

 

Chapter drafts, presentations and related documents are organized by chapter.

Clickhere(PDF, 6MB)to view a combined copy of the draft chapters andhere(PDF, 3MB)for the draft of the Zoning map. These documents reflect changes from City Commission input, text and formatting refinements, and the definitions appendix.

Chapter 1 - General Provisions

Chapter 1, General Provisions, provides the Unified Land Development Code’s legal framework and general concepts and is divided into the following articles:

  • Article I, Adoption of the Unified Land Development Code
  • Article II, Zoning Districts and Official Zoning Map
  • Article III, Concurrency Management
  • Article IV, Transfer of Development Rights

Chapter 2 - Development Review

Chapter 2, Development Review, details the City’s development application requirements, processes, and decision-makers. Table 2.2.1 includes information on the new application types:

Application Type Description Section
Annexation, Voluntary Voluntarily Incorporate Land into the City limits 2.2.3
Appeal Appeal a decision by staff, a board, or the City Commission. 2.2.4
Comprehensive Plan Amendment Changes to the Future Land Use Map or Comprehensive Plan Text 2.2.5
Conditional Uses Development of property indicated as CU in Chapter 3 2.2.7
Development Agreement Formal agreements with the City, usually relating to a specific project 2.2.8
Division of Land Splitting, Combining, and Adjusting the division of land 2.2.9
Master Concept Plan Design and Configuration of a property for development, voluntary and mandatory 2.2.6
Public Art Fulfillment of Public Art Requirement for AC Districts 2.2.10
Rezone Change the zoning designation on a property, standard, and village 2.2.11
Site Development Plan Review structures and infrastructure for proposed development 2.2.12
Special Exception Request a Special Exception use 2.2.13
ULDC Text Amendments Change the text in the ULDC 2.2.14
Vacation Remove or relocate a platted lot line, easement, or right-of-way 2.2.15
Variance Request reduces standards from the ULDC 2.2.16
Waiver Request City Commission waive a code requirement 2.2.17
Minor Planning Applications Applications where staff is the Decision Maker in Table 2.2.2, 2.2.18

Staff's presentation of the new zoning districts from the January 9, 2023 Commission Workshop

Chapter 3 - Zoning

Chapter 3, Zoning provides information on the City’s zoning districts, establishes the permissible uses, and details use-specific standards for development. This chapters separates the City’s zoning districts into three categories: Standard Districts, Village Districts, and Activity Center Districts. Each category has its own use table which indicates whether uses are Primary (P), Accessory (A), Conditional (CU), Special Exception (SE), or Prohibited (X). Primary and Accessory Uses are allowed by right. Conditional Uses must meet the specific conditions included in Article VIII to be allowed by right. If a Conditional Use does not meet the conditions in Article VIII, the use requires a Special Exception. Special Exceptions require Commission approval to be allowed. Prohibited uses are not allowed in any circumstance.

Staff's presentation of the new zoning districts from the April 10, 2023 Commission Workshop

 

Chapter 4 - Site Development

Chapter 4, Site Development specifies the requirements for individual sites or proposed multi-site developments. This chapter will include Rules of Measurement, Buffers and Landscaping, Construction Standards, Design Standards, Fire Safety, Land Clearing, Marine Improvements, Parking and Loading, Signs, Stormwater, Subdivisions, Transportation, and Utilities.

Staff presentation on part  one of chapter four, specifically for activity centers and updated zoning map from the Nov. 6, 2023, Commission workshop:

Staff presentation of part two of chapter 4, specifically site development regulations from the Dec. 4, 2023, Commission workshop:

 

Chapter 5 - Sign Regulations

April 22, 2024 City Commission Workshop regarding ULDC Chapter 5, Sign Regulations:

 

Chapter 6 - Natural Resources

Appendix

The Appendix of the ULDC houses all the definitions. See the Use Definitions for the working list of definitions.

Proposed ULDC Associated Comprehensive Plan Amendment

Ordinance No. 2024-09, with Exhibits(PDF, 3MB)

Supplemental Data & Analysis(PDF, 434KB)

Correspondence from State Agencies(PDF, 3MB)

Future Land Use Data Tables(PDF, 190KB)